Reconstruction of the Saint Martin parish church
Reconstruction of The Saint Martin parish church – Budapest
Hommage á socialist modernism – Monument to an era
A prominent architectural monument dating back to the not so remote past of Hungarian socialism. Its designer, István Szabó, became a cultic church-builder of the dictatorship. The Saint Martin parish church was the last project of his oeuvre.
During the thirty years after its construction, the environs of the church underwent radical changes defined by three main factors: (i) the quarter once inhabited by the socialist working class disappeared, while the factories were replaced by generic, late-postmodern office buildings; (ii) the building itself deteriorated due to wear and tear and its technological solutions grew obsolete partly; (iii) last but not least, the altered role of the Catholic Church also played a part. After the changes of 1989, the religious persecution that had prevailed in Hungary during socialism was followed by a societal and political restoration.
The project provided the architects with the opportunity to reconsider the functions of the building and to redefine its dialogue with its surroundings. They set two major objectives: (i) firstly, they wished to create a transparent communication in the interior of the building, so to this effect they terminated the exterior staircase that was unfit for use by the elderly and the physically disabled. The new entrance was moved to the ground floor, while the adjoining vestibule was designed to function as a starting point for impressively complex spaces: the communal area ideal among others for weddings opens from here, just like the newly built staircase that leads to the upper level of the church interior. Beyond the functional and technological modernisation, the other goal was (ii) to cleanse the church, which they approached as a kind of ’urban found object’, from the deposited elements that were gradually added to it contrary to the original design concept. In order to realise this, the bell-gable on the west elevation was demolished, the building was stripped of the redundant canopies, and the functionless openings were walled up.
The expansion of the church building can be best likened to precision surgery. As the regulations allowed rather limited room for manoeuvre, the new functions were ‘packed into’ a merely two-metre block with a highly complex spatial structure. Thanks to the wall-like complementation of the church’s sculptural volume and the demolition of the old exterior staircase, the building regained its original crystalline monumentality that it had lost in the tight embrace of the subsequently constructed office buildings around it. This cornerstone aspect of the design is further enhanced by the integration of the formerly freestanding crucifix into the body of the church.
The architects did not want to drastically alter the church interior but they made three significant additions: (i) they completed the altar, (ii) they erected a new chapel in lieu of the old entrance, (iii) and installed a false ceiling system reminiscent of the roof structure included in the original architectural plans but never actually implemente
The daughter of the building’s original designer, helped the team to evoke the spirit of István Szabó, while satisfying contemporary expectations.